Nine contracts from the last six years.

Each one with the numbers that matter: covered area, contract type, how long it took and what was actually in the scope. Ask at the office and we will show you the drawings, the BOQ and the cube reports for any of them.


Completed two-storey residence at dusk with a projecting upper floor, deep porch, warm interior lighting and boundary planting.

Featured · Turnkey

Khokhar Residence

A kanal house on a corner plot, built to the owner's architect's drawings with a basement TV lounge and a separate guest suite over the garage. The corner exposure meant a long west elevation, so the front screen and the porch overhang were extended during construction to keep the afternoon sun off the living room glazing — a change agreed and re-costed in writing before it was built.

Handed over with the completion certificate, all test reports, as-built electrical and plumbing layouts, and a snag list closed in eleven days.

Job no.MB-2022-31
LocationDHA Phase 6, Block N, Lahore
Plot1 kanal (4,500 sq ft)
Covered area7,300 sq ft — basement, ground, first floor
ContractTurnkey, premium specification
StructureRCC frame on isolated footings; basement raft with membrane
Duration14 months
CompletedMarch 2024
Reinforced concrete commercial building under construction, four levels of frame complete with slab edges and column stubs visible.

Noor Arcade

Kot Lakhpat, Ferozepur Road · Commercial

Ground-plus-three retail and office arcade with fourteen shop units, a mezzanine over the front bay, and a lift shaft built to the supplier's builder's-work drawing. Handed over as a serviced shell for tenant fit-out, with separate rising mains and meter positions for every unit. All concrete placed at night by transit mixer to keep the service road open during trading hours.

Job no.MB-2022-08
Covered area12,400 sq ft
ContractRCC frame and shell
Duration11 months · completed 2023
Finished house with an exposed brick jaali screen to the stair core, concrete band beams and a mown front lawn.

Al-Rehman House

Bahria Town, Sector C · Residential

Ten marla double storey, structure and finishing on one contract. The west-facing stair core was screened with an exposed brick jaali laid in stretcher bond with a 40 mm gap — cheaper than glazing, and it drops the stair temperature noticeably in June. Raft foundation, since the plot had two feet of made-up fill that we took out rather than built on.

Job no.MB-2023-19
Covered area4,150 sq ft
ContractGrey structure + finishing
Duration10 months · completed 2024
Completed low-rise apartment blocks with brick and render façades, balconies and a clear sky behind.

Largest residential contract to date

Shahtaj Apartments

A twelve-unit walk-up on a double plot in Township, built for a family partnership letting the units out. Two-bedroom flats over four floors, with a common stair, a shared underground tank and a metered supply to each unit. The programme was the hard part rather than the structure: the owners financed it in tranches from rental income elsewhere, so the job ran in three planned phases with a documented pause between each, and the site was secured and made safe for the intervals rather than simply abandoned.

Job no.MB-2020-14
LocationTownship, Sector B-1, Lahore
Covered area14,000 sq ft · 12 units over 4 floors
ContractGrey structure, phased, with finishing to 6 units
Duration16 months including two planned pauses · completed 2022
Small concrete-framed house at grey structure stage against an open sky, with brick infill walls partly built.

Zainab Manzil

Sabzazar Scheme, Block D · Residential

Five marla, double storey, built on a labour-rate contract for an owner who wanted to buy his own material — and did, well, with a list we prepared stage by stage. Proof that a careful owner can save real money this way if he has the time to spend at the market. Finished three weeks inside the agreed programme.

Job no.MB-2024-05
Covered area2,050 sq ft
ContractLabour rate
Duration7½ months · completed 2024
Large ground slab under construction with props, formwork tables and reinforcement laid out across an open industrial floor plate.

Chaudhry Godown

Multan Road, towards Manga Mandi · Industrial

Nine thousand square feet of covered storage: RCC column bases and plinth by us, steel truss roof by the owner's fabricator, and a 6-inch power-floated floor slab designed to take a loaded forklift. Two loading bays with a raised dock, and an office and washroom block along the road elevation.

Job no.MB-2023-27
Covered area9,000 sq ft
ContractCivil works, coordinated with steel fabricator
Duration6 months · completed 2024
Brick and concrete building under construction with protective sheeting to the lower floor and workers on the upper slab.

Al-Falah Grammar School — new block

Manga Mandi · Institutional

Eight classrooms over ground and first floor, plus a staff room and washroom block, built alongside a school that stayed open throughout. Work was restricted to after 2pm on school days, with a hoarded and separately gated site, and the noisy structural work was concentrated into the summer holidays.

Job no.MB-2021-12
Covered area6,800 sq ft
ContractGrey structure + finishing
Duration9 months · completed 2022
Scaffolding erected against the full height of an existing building while work proceeds on the upper floors.

Butt Residence — added storey

Samanabad · Structural retrofit

A second floor added to a 1990s house. We insisted on opening two footings and checking the existing columns before quoting; four columns needed jacketing and dowelling, which added a month and about nine per cent to the cost. The alternative was a cheaper quotation from somebody who would not have looked.

Job no.MB-2024-22
Covered area1,600 sq ft added
ContractStructural retrofit + new floor, turnkey
Duration5 months · completed 2025
Worker finishing a smooth internal wall surface by hand during the plastering stage of a building.

Dr. Naveed Clinic & Residence

Green Town · Mixed use

Consulting rooms, a small procedure room and a waiting area at ground level with the family's home above, on one 7-marla plot. Separate entrances, separate meters, and acoustic treatment in the slab and party wall so that the waiting room and the drawing room upstairs do not share a conversation.

Job no.MB-2025-03
Covered area3,400 sq ft
ContractTurnkey, standard specification
Duration7 months · completed 2025

Currently on site

What we are building this month

Updated at the start of each month. If you want to see how we work before you commit to anything, ask and we will arrange for you to walk one of these with the site supervisor.

Live contracts · August 2026
Job no.LocationScopeStageHandover due
MB-2025-11Bedian Road4 kanal farmhouse — boundary wall, servant block, main house structureFirst floor slab pouredFeb 2027
MB-2026-02Johar Town, Block G10 marla house, turnkeyBrickwork and internal plasterDec 2026
MB-2026-04Valencia Town1 kanal house, grey structure onlyExcavation and footingsApr 2027
MB-2026-06Sabzazar5 marla double storey, labour rateGround floor slab shutteringMar 2027

Photographs on this page are representative of the type and standard of work described. Photographs of individual clients' completed houses are published only with the owner's written permission, which most families understandably prefer not to give.

Next step

Want the file for one of these?

Drawings, bill of quantities, stage photographs and laboratory reports are kept for every completed contract. Tell us which job interests you, or which area you are building in, and we will have the file out when you come in.

+92 300 846 2715

Request an estimate See what each contract covers